Hit enter to search or ESC to close
Portable Washroom
Pain Point | Traditional Toilets | ZN-House Container Solution | User Benefit |
---|---|---|---|
Slow Deployment | 30-45 day construction cycles delay projects | ✅ 72h turnkey delivery® • No foundation needed • 20+unit cluster deployment |
▶ Launch projects 80% faster |
Relocation Waste | Demolition required (0% reuse) | ✅ 100% relocatable® • Crane-lift modular mobility® • Zero reassembly cost |
▶ 5+reuse cycles = 42% TCO savings |
Water Leakage | 37% failure rate from field errors | ✅ Zero-leak guarantee® • 3-step factory QC: 1) Seam sealing → 2) Pressure testing → 3) Rain simulation |
▶ Eliminate $15k+/unit repair costs |
Customization Limits | Costly post-install modifications | ✅ Pre-engineered flexibility® • Explosion-proof specs® • ADA ramps • Chemical-resistant piping |
▶ Perfect fit for mines/industrial sites |
Budget | Hidden change orders (+35% avg.) | ✅ Fixed factory pricing® • All-inclusive packages® • 5-year maintenance included |
▶ Accurate forecasting + 30% CAPEX reduction |
Deploy self-contained sanitation in <90 minutes with our featherlight EPS units. Proprietary nano-coated panels repel bacteria and odors while maintaining structural integrity from -30°C to 50°C. No cranes or foundations needed – ideal for restricted-access sites: • Mountain trailheads • Urban pop-up events • Film location shoots
Multi-story sanitation clusters made possible with ISO-certified interlocking mechanisms. Features 2.0mm Corten steel skins with seismic bracing, supporting 3-tier stacking for 10,000+ user events. Integrated systems include: • Greywater recycling • RFID access control • Remote tank monitoring Essential for Formula 1 circuits and offshore rigs.
Best for: Festivals • Parks • Short-term construction
Best for: Festivals • Parks • Short-term construction
1 Unit = 3 Toilets + 2 Sinks
*Case: NZ construction site reduced COVID delays by 37% with 5-unit clusters*
Zone Type | Unit Function | Density Requirement |
---|---|---|
Production Workshop | Basic toilet + quick-clean area | 1 unit per 100 people |
Administrative Office Area | Accessible facilities + nursing room | 1 unit per 80 people |
Hazardous Chemicals Operation Area | Explosion-proof ventilation + emergency shower | Independent isolation unit |
Municipal public services Network: Elastic Urban CoverageChallenge:Aginginfrastructure,event surges (50,000+users), disaster response.
Type | Use Case |
---|---|
Fixed | Parks/Bus Hubs (landscape integration) |
Mobile | Festivals (48 h setup) |
Disaster | Flood Zones (solar-powered) |
Phase | Industry Standard | ZN House Advantage |
---|---|---|
Design Finalization | 2–4 weeks | 72 h with 3D mockups |
Production | 8–12 weeks | 4–6 weeks (ISO-paced) |
Leak Certification | Singletest | Triple validation |
If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.